1800 266 8222

From Bathroom to Kitchen,its india's tru choice

User-friendly uPVC Plumbing Systems

uPVC PipingSystems

trubore-standard-product
Pipes

Schedule 40,80 -
As per ASTM D - 1785(Plain Ended)

Fittings

Schedule 80 as per ASTM D - 2467
Schedule 40 as per ASTM D - 2466

Extensively used in
  • commerical
    Commerical
  • Swimming-pools
    Swimming pools
  • residental
    Residental
  • industry
    Industry

Applications

  • Indoor and Outdoor use for cold water applications
  • Residential complexes,commercial buildings,public utilities,swimming pools
  • RO and DM water plants
  • For Concealed, down take & terrace looping

Note:

  1. Not to use with Compressed air and gases.
  2. Pressure rating of uPVC pipes & fitting is temperature related.Derating factor should be applied during designing & operation for higher tempearture appplications.For detailed usage refer IS 4985 or contact us
  3. Installation of uPVC pipelines should be done in accordance with IS 7634(Part -3)
  4. Flow velocity in the pipelines should not be greater than 1.5 meter/sec.
  5. For threaded pipes & fittings the work pressure at 23℃ should be considered as 50℃ of rated
  6. DO not use uPVC pipes & fittings for hydro pneumatic applications

Major Advantages

  • Lead-free material ensures safe drinking water.
  • Exceptional corrosion resistance ensures constant flow over its lifetime.
  • Light-weight but strong.
  • Self-extinguishing(Does not support combustion).
  • High impact resistance,ensures high impact quality performance at lower temperatures.
  • Fast and Easy Installation.
  • Long Life.

Pipes

Pressure for pipes (Solvent Weld) at 23℃
Scheduled 40Scheduled 80
Nominal BoreOutside DiameterWall thicknessWorking PressureWall thicknessWorking Pressure
(inch)Kg/cm2(mm)Kg/cm2(mm)Kg/cm2
1/221.34 ±0.102.77 + 0.5142.203.73 + 0.5159.75
3/426.67 ±0.102.87 + 0.5133.753.91 + 0.5148.50
133.40 ±0.133.38 + 0.5131.604.55 + 0.5344.25
1 1/442.16 ±0.133.56 + 0.5126.004.85 + 0.5836.60
1 1/248.26 ±0.153.68 + 0.5123.255.08 + 0.6133.00
260.32 ±0.153.91 + 0.5119.655.54 + 0.6628.10
2 1/273.02 ±0.185.16 + 0.6121.107.01 + 0.8429.55
388.90 ±0.205.49 + 0.6618.257.62 + 0.9126.00
4114.30 ±0.236.02 + 0.7115.508.56 + 1.0222.50
6168.28 ±0.287.11 + 0.8612.6010.97 + 1.3219.65
Pressure for Fittings (Solvent Weld) at 23℃
Scheduled 40Scheduled 80
Nominal BoreWorking PressureWorking Pressure
(inch)Kg/cm2Kg/cm2
1/2-35.85
3/4-29.10
1-26.55
1 1/4-21.95
1/2-19.80
2-16.85
2 1/2-17.70
3-15.60
4-13.50
67.50-

Fittings

Ball Valves

Know More

Coupler

Know More

Cross Over Bend

Know More

Elbow

Know More

Elbow 45°

Know More

End Cap

Know More

Equal Tee

Know More

F.T.A

Know More

Four Way Tee

Know More

M.T.A

Know More

Reducing Bush

Know More

Reducing Tee

Know More

Tank Connector Moulded

Know More

Union

Know More

F.T.A (Brass)

Know More

Female thrd. elbow

Know More

M.T.A (Brass)

Know More

Solvents

tin

Tin

Know More
tube

tube

Know More

DO's & Dont's

DesignStage

  • Consider provision for expansion and contraction of piping installation
  • Consider pressure de-rating factor for use of pipe line at higher temperature for a maximum of up to 45℃.

Handling,Transpotation & Storage

  • Pipes & fittings shall be stored in covered area.
  • Pipes shall be stored on levelled flat forund.
  • The shacking height of a pipe stack shall not be more than 50 meters
  • Do not drag or drop/throw pipes while loading/unloading & shifting.
  • Do not overhang the pipes out of vehicle body while transporting.
  • Don not stack the pipes for more than 1.5 meters of height.

Jointing & Installation

  • In case of threads to be done in pipes,parallel threads are recommended.
  • Use only uPVC Solvent cement for jointing. Other types of solvent cements may contain ingredients which are not recommended.
  • Cut the pipe at right angle to its axis.
  • Cut the pipe at right angle to its axis.
  • Before making joint,remove burr and clean the pipe surface/threads.
  • For Solvent cement joints rotate the pipe through the quator turn while inserting in the fitting.
  • Clean excess solvent cement which comes out from joint.
  • Cure the solvent joint for 24 hours for atleast 24 hours in dry weather & 48 hours in humid weather.
  • For threaded joint,use teflon tape for thread smiling.
  • Use recommened spacing for clamping the installation.
  • In Case of concealed pipeline,plastoring with 1:4 mortar is recommended
  • Do not use Solvent cement whick is gelled/not free flowing.
  • While solvent cementing avoid heat exposure or open flame.
  • Do not hammer the pipeline.
  • Do not over-tighten the treaded joints.

Testing & Commissioning

  • Pressure test the installation with water only.
  • Before testing ensure that all joints are cured fully.
  • Ensure that all waves are air relief mechanism at the end of elevations are opened.
  • During initial filling of pipeline,limit water velocity up to 0.3m/s for releasing the entrapped air.
  • Continue fillig until entrapped air is completely removed from installation
  • Do not use air or gas for installation testing.