Trubore uPVC plumbing systems in India

From Bathroom to Kitchen,its india’s tru choice

User-friendly uPVC Plumbing Systems

Lead free material, ensures safe drinking water – Trubore uPVC Plumbing SystemsCorrosion resistant – Trubore uPVC Plumbing Systems in IndiaFast and easy installation - Trubore uPVC Plumbing Systems in india
Standard icon  – Trubore uPVC Plumbing Systems
Pipes

Schedule 40,80 –
As per ASTM D – 1785(Plain Ended)

Fittings

Schedule 80 as per ASTM D – 2467 Schedule 40 as per ASTM D – 2466

EXTENSIVELY USED IN
  • Application of UPVC pipes in commercial areas – Trubore Pipes
    Commerical
  • Trubore uPVC Plumbing - Swimming Pool Application
    Swimming pools
  • Trubore uPVC Plumbing - Residential Application
    RESIDENTIAL
  • Trubore uPVC Plumbing - Industrial Application
    Industry

uPVC Plumbing System

uPVC pipes & fittings are made of unplasticized polyvinyl chloride material. This piping system can withstand temperatures up to 600C and is only used for cold water applications. This system is extensively used in commercial, residential & industries for the usage of cold water. These pipes and fittings are joined with the help of uPVC solvent cement. With the use of solvent cement, the joints become everlasting once installed. Threaded joints are also provided for transition joints. The pipes are manufactured in a variety of sizes and thicknesses to suit the usage requirement.

APPLICATIONS

  • uPVC pipes and fittings manufacturers in india, Indoor and Outdoor use for cold water applications
  • Residential complexes, commercial buildings, public utilities, swimming pools
  • RO and DM water plants
  • For Concealed, down take & terrace looping

MAJOR ADVANTAGES

  • Lead-free material ensures safe drinking water.
  • Exceptional corrosion resistance ensures constant flow over its lifetime.
  • Light-weight but strong.
  • Self-extinguishing(Does not support combustion).
  • uPVC pipes have High impact resistance, ensures high impact quality performance at lower temperatures.
  • Fast and Easy Installation.
  • Long Life.

PIPE DIMENSIONS

Pressure for pipes (Solvent Weld) at 23℃
Scheduled 40 Scheduled 80
Nominal Bore Outside Diameter Wall thickness Working Pressure Wall thickness Working Pressure
(mm) (inch) (mm) (mm) Kg/cm2 (mm) Kg/cm2
15 1/2 21.34 ±0.10 2.77 + 0.51 42.20 3.73 + 0.51 59.75
20 3/4 26.67 ±0.10 2.87 + 0.51 33.75 3.91 + 0.51 48.50
25 1 33.40 ±0.13 3.38 + 0.51 31.60 4.55 + 0.53 44.25
32 1 1/4 42.16 ±0.13 3.56 + 0.51 26.00 4.85 + 0.58 36.60
40 1 1/2 48.26 ±0.15 3.68 + 0.51 23.25 5.08 + 0.61 33.00
50 2 60.32 ±0.15 3.91 + 0.51 19.65 5.54 + 0.66 28.10
65 2 1/2 73.02 ±0.18 5.16 + 0.61 21.10 7.01 + 0.84 29.55
80 3 88.90 ±0.20 5.49 + 0.66 18.25 7.62 + 0.91 26.00
100 4 114.30 ±0.23 6.02 + 0.71 15.50 8.56 + 1.02 22.50
150 6 168.28 ±0.28 7.11 + 0.86 12.60 10.97 + 1.32 19.65
200 8 219.30 ±0.38 8.18 + 0.99 11.20 12.70 + 1.52 17.50
250 10 273 ±0.38 9.27 + 1.12 9.90 15.06 + 1.80 16.20

Note :
1. For threaded pipes and fittings, the working pressure at 23℃ shall be considered as 50% rating.
2. Pressure rating at uPVC pipes and fittings is tempreture related. Derating factor shall be applied for applications at higher.

Working Pressure for Fittings (Solvent Weld) at 23℃
Scheduled 40 Scheduled 80
Nominal Bore Working Pressure
(mm) (inch) Kg/cm2 Kg/cm2
15 1/2 25.30 35.85
20 3/4 20.25 29.10
25 1 18.95 26.55
32 1 1/4 15.60 21.95
40 1 1/2 13.95 19.80
Working Pressure for Fittings (Solvent Weld) at 23℃
Scheduled 40 Scheduled 80
Nominal Bore Working Pressure
(mm) (inch) Kg/cm2 Kg/cm2
50 2 11.75 16.85
65 2 1/2 17.70
80 3 15.60
100 4 13.50
150 6 7.50

Note: Working pressure for metal insert fittings is 15Kg/cm2

UPVC FITTINGS

BALL VALVE

Know More

BLIND FLANGE

Know More

COUPLER

Know More

CROSS OVER BEND

Know More

ELBOW

Know More

ELBOW 45°

Know More

END CAP

Know More

EQUAL TEE

Know More

F.T.A

Know More

FOUR WAY TEE

Know More

M.T.A

Know More

OPEN FLANGE

Know More

REDUCER

Know More

REDUCING BUSH

Know More

REDUCING TEE

Know More

TANK CONNECTOR MOULDED

Know More

UNION

Know More

F.T.A (BRASS)

Know More

FEMALE THRD TEE (BRASS INSERT)

Know More

FEMALE THRD. ELBOW

Know More

M.T.A (BRASS)

Know More

SOLVENTS

Trubore uPVC Solvent Cement - Tin

TIN

Know More
Trubore uPVC Solvent Cement - Tube

TUBE

Know More

DO’S & DONT’S

DESIGN STAGE

  • Consider provision for expansion and contraction of piping installation
  • Consider pressure de-rating factor for use of upvc pipe line at higher temperature for a maximum of up to 45℃.

HANDLING, TRANSPOTATION & STORAGE 

  • UPVC Pipes and fittings shall be stored in covered area.
  • Pipes shall be stored on levelled flat forund.
  • The shacking height of a upvc pipe stack shall not be more than 50 meters
  • Do not drag or drop/throw pipes while loading/unloading & shifting.
  • Do not overhang the pipes out of vehicle body while transporting.
  • Don not stack the pipes for more than 1.5 meters of height.

JOINTING & INSTALLATION 

  • In case of threads to be done in pipes,parallel threads are recommended.
  • Use only uPVC Solvent cement for jointing. Other types of solvent cements may contain ingredients which are not recommended.
  • Cut the pipe at right angle to its axis.
  • Before making joint,remove burr and clean the pipe surface/threads.
  • For Solvent cement joints rotate the pipe through the quator turn while inserting in the upvc fitting.
  • Clean excess solvent cement which comes out from joint.
  • Cure the solvent joint for 24 hours for atleast 24 hours in dry weather & 48 hours in humid weather.
  • For threaded joint,use teflon tape for thread smiling.
  • Use recommened spacing for clamping the installation.
  • In Case of concealed pipeline, plastoring with 1:4 mortar is recommended
  • Do not use Solvent cement whick is gelled/not free flowing.
  • While solvent cementing avoid heat exposure or open flame.
  • Do not hammer the pipeline.
  • Do not over-tighten the treaded joints.

TESTING & COMMISSIONING 

  • Pressure test the installation with water only.
  • Before testing, ensure that all joints are cured fully.
  • Ensure that all waves are air relief mechanism at the end of elevations are opened.
  • During initial filling of pipeline,limit water velocity up to 0.3m/s for releasing the entrapped air.
  • Continue fillig until entrapped air is completely removed from installation
  • Do not use air or gas for installation testing.