From Sewerage To Drainageits india's tru choice
Durable uPVC Underground Drainage Pipes.
From Bathrooms to kitchens,its india's tru choice

Pipes as per IS:13592

Extensively used in
-
Waste Drainage Line
[row xclass="advantages-product-row space-row"]
Applications
[column md="12" xclass="advantages-product advantages-product-content advantages-product-content-one"]- Underground drainage systems.
Major Advantages
[column md="12" xclass="advantages-product advantages-product-content advantages-product-content-one"]- Lighter than conventional C.I. pipes but strong.
- Used for underground installations.
- Long life due to improved strength.
- Compatible with other drainage products.
- Easy-to-install.
- Smooth bore.
- Leak-proof joints.
- Long life.
- Cost Saving.
Jointing Method
[column md="12" xclass="advantages-product advantages-product-content advantages-product-content-one"]- Solvent Joint or Elastomeric Sealing Ring.
[row xclass="dimensions-container-table-container space-row"]
[column md="12" xclass="dimension-container specific-product-dimension-container"]
[/column]
[/row]
Dimensions
Pipe Size (mm) | Nominal Outside Diamater (mm) | Mean Outside Diamater (mm) | Wall Of Thickness(mm) | ||||||
---|---|---|---|---|---|---|---|---|---|
SN2 (SDR 51) | SN4 (SDR 41) | SN8 (SDR 34) | |||||||
Min | Max | Min | Max | Min | Max | Min | Max | ||
63 | 63.0 | 63.00 | 63.30 | - | - | - | - | 2.70 | 3.10 |
75 | 75.0 | 75.00 | 75.30 | - | - | - | - | 2.80 | 3.30 |
90 | 90.0 | 90.00 | 90.30 | - | - | - | - | 2.90 | 3.40 |
110 | 110.0 | 110.00 | 110.40 | - | - | - | - | 3.20 | 3.70 |
125 | 125.0 | 125.00 | 125.40 | - | - | 3.20 | 3.70 | 3.70 | 4.40 |
160 | 160.0 | 160.00 | 160.50 | 3.20 | 3.70 | 4.00 | 4.60 | 4.70 | 5.40 |
200 | 200.0 | 200.00 | 200.60 | 3.90 | 4.50 | 4.90 | 5.60 | 5.90 | 6.70 |
250 | 250.0 | 250.00 | 250.80 | 4.90 | 5.60 | 6.20 | 7.00 | 7.30 | 8.30 |
315 | 315.0 | 315.00 | 316.00 | 6.20 | 7.00 | 7.70 | 8.70 | 9.20 | 10.30 |
400 | 400.0 | 400.00 | 401.20 | 7.90 | 8.90 | 9.80 | 11.00 | 11.70 | 13.10 |
[row xclass="Dons-donts-main-container space-row"]
[/column]
[column md="6" xclass="inner-list-do-dont-container"]
[/column]
[/row]
[row xclass="do-dont-row do-dont-row-design-stage space-row"]
[/column]
[column md="6" xclass="inner-list-do-dont-container"]
[/column]
[/row]
[row xclass="do-dont-row do-dont-row-design-stage space-row"]
[/column]
[column md="6" xclass="inner-list-do-dont-container "]
[/column]
[/row]
DO's & Dont's
[/row] [row xclass="do-dont-row do-dont-row-design-stage space-row"]DesignStage
[column md="6" xclass="inner-list-do-dont-container"]
- Store the pipes on flat surfaces under covered area.
- Use flat bodied vehicle for transportation of pipes.
- Pipes may be stored on timber support of at least 75mm width & breadth, placed at the interval of 1.2 meters.
- While stacking socketed pipes, stack the pipe with socket protruding at alternate ends.

- Do not use these pipes for pressure- based applications and above ground installations.
Handling,Transpotation & Storage
[column md="6" xclass="inner-list-do-dont-container"]
- Before starting the installation, check every pipe for any damage on surface/ socket/spigot end.
- While laying in trench, ensure that the pipe bed is firm and provides even support throughout the pipe length.
- Use the pipe bedding material which is free flowing, granular & without having sharp edges
- Ensure that pipe is laid straight in trenches.
- Before making joint, remove burr and clean the pipe surface.

- Do not drag or drop/throw the pipes while loading/unloading & shifting.
- Do not overhang the pipes out of vehicle body while transporting.
- Do not stack the pipes for more than 1.5 meters height.
Jointing & Installation
[column md="6" xclass="inner-list-do-dont-container"]
- For solvent cement joint, use only recommended solvent cement and cure the solvent joint for at least 24 hours.
- For elastomeric sealing ring joints, ensure that the ring is positioned properly in the socket grove. Use lubricant during jointing.
- Provide groove on the bed by digging soil below the socket joint to ensure that the pipe is uniformly supported along its length.
- Before filling the trench, check the pipe line for leakages from joints.
- In case of laying the pipes on steep/ high slopes, concrete bedding with mechanical fastening is necessary.

- Do not compact the backfill till at least a backfill of 300mm height is placed on top of the pipeline.
- Do not use solvent cement which is gelled/not free flowing.
- While solvent cementing avoid heat exposure or open flame.