Underground Drainage System

From Sewerage To Drainageits india's tru choice

Durable uPVC Underground Drainage Pipes.

From Bathrooms to kitchens,its india's tru choice

Underground uPVC Draingae pipe

trubore-standard-product
Pipes as per IS:13592
isi-mark
Extensively used in
  • wastedrainageline
    Waste Drainage Line
[row xclass="advantages-product-row space-row"]

Applications

[column md="12" xclass="advantages-product advantages-product-content advantages-product-content-one"]
  • Underground drainage systems.
[/column] [/row] [row xclass="advantages-product-row-major space-row"]

Major Advantages

[column md="12" xclass="advantages-product advantages-product-content advantages-product-content-one"]
  • Lighter than conventional C.I. pipes but strong.
  • Used for underground installations.
  • Long life due to improved strength.
  • Compatible with other drainage products.
  • Easy-to-install.
  • Smooth bore.
  • Leak-proof joints.
  • Long life.
  • Cost Saving.
[/column] [/row] [row xclass="advantages-product-row-major space-row"]

Jointing Method

[column md="12" xclass="advantages-product advantages-product-content advantages-product-content-one"]
  • Solvent Joint or Elastomeric Sealing Ring.
[/column] [/row]
[row xclass="dimensions-container-table-container space-row"] [column md="12" xclass="dimension-container specific-product-dimension-container"]

Dimensions

Pipe Size (mm) Nominal Outside Diamater (mm) Mean Outside Diamater (mm) Wall Of Thickness(mm)
SN2 (SDR 51) SN4 (SDR 41) SN8 (SDR 34)
Min Max Min Max Min Max Min Max
63 63.0 63.00 63.30 - - - - 2.70 3.10
75 75.0 75.00 75.30 - - - - 2.80 3.30
90 90.0 90.00 90.30 - - - - 2.90 3.40
110 110.0 110.00 110.40 - - - - 3.20 3.70
125 125.0 125.00 125.40 - - 3.20 3.70 3.70 4.40
160 160.0 160.00 160.50 3.20 3.70 4.00 4.60 4.70 5.40
200 200.0 200.00 200.60 3.90 4.50 4.90 5.60 5.90 6.70
250 250.0 250.00 250.80 4.90 5.60 6.20 7.00 7.30 8.30
315 315.0 315.00 316.00 6.20 7.00 7.70 8.70 9.20 10.30
400 400.0 400.00 401.20 7.90 8.90 9.80 11.00 11.70 13.10
[/column] [/row]
[row xclass="Dons-donts-main-container space-row"]

DO's & Dont's

[/row] [row xclass="do-dont-row do-dont-row-design-stage space-row"]

DesignStage

[column md="6" xclass="inner-list-do-dont-container"]
  • Store the pipes on flat surfaces under covered area.
  • Use flat bodied vehicle for transportation of pipes.
  • Pipes may be stored on timber support of at least 75mm width & breadth, placed at the interval of 1.2 meters.
  • While stacking socketed pipes, stack the pipe with socket protruding at alternate ends.
[/column] [column md="6" xclass="inner-list-do-dont-container"]
  • Do not use these pipes for pressure- based applications and above ground installations.
[/column] [/row] [row xclass="do-dont-row do-dont-row-design-stage space-row"]

Handling,Transpotation & Storage

[column md="6" xclass="inner-list-do-dont-container"]
  • Before starting the installation, check every pipe for any damage on surface/ socket/spigot end.
  • While laying in trench, ensure that the pipe bed is firm and provides even support throughout the pipe length.
  • Use the pipe bedding material which is free flowing, granular & without having sharp edges
  • Ensure that pipe is laid straight in trenches.
  • Before making joint, remove burr and clean the pipe surface.
[/column] [column md="6" xclass="inner-list-do-dont-container"]
  • Do not drag or drop/throw the pipes while loading/unloading & shifting.
  • Do not overhang the pipes out of vehicle body while transporting.
  • Do not stack the pipes for more than 1.5 meters height.
[/column] [/row] [row xclass="do-dont-row do-dont-row-design-stage space-row"]

Jointing & Installation

[column md="6" xclass="inner-list-do-dont-container"]
  • For solvent cement joint, use only recommended solvent cement and cure the solvent joint for at least 24 hours.
  • For elastomeric sealing ring joints, ensure that the ring is positioned properly in the socket grove. Use lubricant during jointing.
  • Provide groove on the bed by digging soil below the socket joint to ensure that the pipe is uniformly supported along its length.
  • Before filling the trench, check the pipe line for leakages from joints.
  • In case of laying the pipes on steep/ high slopes, concrete bedding with mechanical fastening is necessary.
[/column] [column md="6" xclass="inner-list-do-dont-container "]
  • Do not compact the backfill till at least a backfill of 300mm height is placed on top of the pipeline.
  • Do not use solvent cement which is gelled/not free flowing.
  • While solvent cementing avoid heat exposure or open flame.
[/column] [/row]